1. START FROM THE OVERALL TECHNICAL PLAN
Positions and interfaces should be known before crews arrive so contradictory decisions are not made on site.
FORCE EVENT — STRUCTURE GUIDE
Structure, lighting and video are often interdependent. A support may need to be in place before equipment can be installed, while some cables or elements must remain accessible during setup.
Coordination therefore depends on one shared work sequence rather than three independent schedules.
01
Positions and interfaces should be known before crews arrive so contradictory decisions are not made on site.
02
Each trade should know the prerequisites for its work and which elements need to remain accessible.
03
Crews may need the same spaces, access equipment or working windows, so conflicts should be identified in the schedule.
04
Removal often follows the dependencies in reverse, so dismantling should be considered during setup planning.
IN THE SAME SERVICE CLUSTER
How to prepare aluminium event structure setup: validated plans, access, position, integrated elements and coordination with other technical trades.
READ THE GUIDE →Understand the role of aluminium event structure and its interfaces with lighting, sound, video, scenery and technical routes.
READ THE GUIDE →Good structure-lighting-video coordination depends on a shared plan, agreed work sequence and clearly organised work areas.
Explore FORCE EVENT structure crewsWith your consent, FORCE EVENT uses Google Analytics 4 through Google Tag Manager to measure website audiences and essential conversions. Data entered in forms (name, email, phone number, CV/resume or message) is never sent to Analytics. Measurement tools load only after you accept.
Learn more