1. IDENTIFY DEPENDENT TRADES
Production should identify the technical systems that depend on event power and the responsible contacts for each trade.
FORCE EVENT — POWER GUIDE
Sound, lighting and video depend on the planned power system. Power therefore needs to be integrated into the technical schedule before other trades can operate their systems.
This coordination concerns operational needs and work sequencing; electrical design and validation remain the responsibility of appropriately qualified professionals.
01
Production should identify the technical systems that depend on event power and the responsible contacts for each trade.
02
The planned distribution needs to be available at the correct point for commissioning and operation of the other systems.
03
Technical areas, cable routes and circulation should be coordinated with structure, road crew and venue constraints.
04
Shutdown and removal follow an agreed sequence within the overall technical plan.
IN THE SAME SERVICE CLUSTER
Sources, distribution, equipment loads, cable routes and schedule: the information to prepare for event power operations.
READ THE GUIDE →Before an event generator operation: planned sources, distribution, equipment loads, position, technical routes and schedule.
READ THE GUIDE →Power should be coordinated with the trades that depend on it, while electrical decisions and validation remain with appropriately qualified professionals.
Explore FORCE EVENT power crewsWith your consent, FORCE EVENT uses Google Analytics 4 through Google Tag Manager to measure website audiences and essential conversions. Data entered in forms (name, email, phone number, CV/resume or message) is never sent to Analytics. Measurement tools load only after you accept.