01
GENERATOR SYSTEMS
FORCE EVENT handles setup and organisation around the generator systems planned for the event.
FORCE EVENT — POWER
FORCE EVENT deploys the practical event power and electrical distribution infrastructure planned for operations in Paris and across France.
The service can cover generator-related setup, distribution boards, cable runs, required operational support and dismantling.
Event power connects the planned source to the equipment used across the technical system. FORCE EVENT crews work on generator-related installation, electrical distribution and cable routing.
Generator configurations vary substantially. A 2 x 60 kVA system or a Twinpack 2 x 150 kVA illustrate possible scales, not standard packages or a claim that FORCE EVENT owns the generator sets.
01
FORCE EVENT handles setup and organisation around the generator systems planned for the event.
02
Crews deploy the distribution boards and distribution elements specified for the technical system.
03
Power cables are routed and deployed across the site to supply the different event systems.
Producers, agencies, technical service providers and event venues can involve FORCE EVENT in practical power deployment from the planned generator installation to the equipment connection points.
FORCE EVENT delivers event electrical distribution and power cabling operations in Paris and across France.
Generator, distribution board and cable routing configurations are defined by the real requirements of each operation.
20
30 000+
500+
FORCE EVENT has worked in event technical operations for 20 years. This experience provides an on-site view of power deployment, electrical distribution and event cabling. Across FORCE EVENT, more than 500 crew profiles are referenced in France, including nearly 250 in Paris and the Île-de-France region.
01 — PRACTICAL GUIDE
Sources, distribution, equipment loads, cable routes and schedule: the information to prepare for event power operations.
READ THE GUIDE →02 — PRACTICAL GUIDE
How to prepare the interfaces between event power distribution, sound, lighting and video within the technical schedule.
READ THE GUIDE →03 — PRACTICAL GUIDE
Before an event generator operation: planned sources, distribution, equipment loads, position, technical routes and schedule.
READ THE GUIDE →Tell us about the planned sources, distribution and cable routes for your event.
With your consent, FORCE EVENT uses Google Analytics 4 through Google Tag Manager to measure website audiences and essential conversions. Data entered in forms (name, email, phone number, CV/resume or message) is never sent to Analytics. Measurement tools load only after you accept.
Learn more